Egypt has signed an agreement with US-based oilfield services company Weatherford to restore around 100 stalled oil wells within 18 months. Petroleum and Mineral Resources Minister Karim Badawi attended the signing of the framework agreement between the Egyptian General Petroleum Corporation and the company. The programme is intended to increase domestic production by returning existing wells to operation instead of relying only on new drilling projects.
The planned work will cover both onshore and offshore production areas across Egypt. The programme will use artificial intelligence to analyse well data, assess the potential of individual wells and identify the most suitable methods for restoring production. Authorities say the technology will help determine which wells can be brought back into operation and which intervention methods are likely to deliver the best results.
One important feature of the agreement is the use of technologies that can carry out intervention operations without conventional drilling rigs. This approach is expected to reduce the time and cost associated with restoring wells. It could also improve operational efficiency by allowing specialists to focus on the most promising sites. The government hopes that faster intervention will help increase output from existing oil fields.
Badawi said the agreement supports the ministry’s five-year plan to raise Egypt’s domestic oil and natural gas production through the end of the 2029–2030 fiscal year. The plan includes exploration, development of newly discovered fields and efforts to maximise output from resources already in operation. Restoring stalled wells is therefore one part of a wider strategy to strengthen the country’s energy supply and reduce pressure on domestic production.
The agreement will now need to move from planning into practical operations across the selected production areas. Its success will depend on accurate technical assessments, effective cooperation between the Egyptian corporation and Weatherford, and the ability to complete work within the 18-month target. If the programme achieves its aims, it could help Egypt recover production capacity from existing assets while supporting its broader energy development plans.
